SR. NO.NAME OF APPROVALNAME OF DEPARTMENTTIMELINEDOCUMENT REQUIREDCONTACT DETAILS OF NODAL
1NOC from Fire Department (N.O.C for Flammable gas Godown/LPG Gas Godown)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
2NOC from Fire Department (N.O.C for Non-dangerous petroleum upto 8000 litres. And LPG/LNG upto 200 kgs for commercial activities)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
3NOC from Fire Department (N.O.C for Non-dangerous petroleum upto 5000 litres. And LPG/LNG upto 100 kgs for commercial activities)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
4NOC from Fire Department (N.O.C for Storage and use of LPG upto 50 kgs for commercial activities)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
5NOC from Fire Department (N.O.C for Shops and Establishments failing under the jurisdiction of Village Panchayats)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
6NOC from Fire Department (N.O.C for Shops and Establishments not covered by the Village Panchayat Jurisdiction)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
7NOC from Fire Department (N.O.C for Video Cinema Houses)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
8NOC from Fire Department (N.O.C for Restaurants and bakeries, eating house where the seating capacity does not exceed 100 persons)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
9NOC from Fire Department (N.O.C for Lodging Houses and Hotels under non-classified category less than 15 metres in height having upto 25 rooms)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
10NOC from Fire Department (N.O.C for Restaurants and bakeries, eating house where the seating capacity does not exceed 50 personsDirectorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
11NOC from Fire Department (N.O.C for Restaurants and eating house where the seating capacity does not exceed 20 persons)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
12NOC from Fire Department (N.O.C for Lodging Houses and Hotels under non-classified category less than 15 metres in height having upto 15 rooms)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
13NOC from Fire Department (N.O.C for Temporary Shacks under Tourist Trade Act)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
14NOC from Fire Department (N.O.C for Scrap Yards under Goa Waste (Scrap) Recycling Unit Scheme 2010.)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
15NOC from Fire Department (N.O.C for Printing, Composing, Binding, etc. where Linotype or other allied machines are used such as Mono-type wherein the process of meeting and casting is involved or using above 10 horse power of motor.)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
16NOC from Fire Department (N.O.C for Storing, Dumping, Curing, Cleansing etc. of Cycle Tyres and tubes above 500)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
17NOC from Fire Department (Final N.O.C for Occupation of Building over 15 metres in height from the ground)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
18NOC from Fire Department (Final N.O.C for Factories and Establishments where electrical motor capacity exceeds 5 H.P and above)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
19NOC from Fire Department (Final N.O.C for Shipyards and Workshops)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
20NOC from Fire Department (Final N.O.C for Tank Farm of Petroleum Products)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
21NOC from Fire Department (Final N.O.C for POL dispensing outlet)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
22NOC from Fire Department (Final N.O.C for Godown and Warehouses (High Hazard)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
23NOC from Fire Department (Final N.O.C for Godown and Warehouses (Moderate Hazard)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
24NOC from Fire Department (Final N.O.C for Godown and Warehouses (Low Hazard)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
25NOC from Fire Department (Final N.O.C for public places like exhibition halls, entertainment places, dancing halls, theatres, assembly halls, seaport, airport, railway station, bus stations, stadium)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
26NOC from Fire Department (Final N.O.C for Educational and Institutional Places)Directorate of Fire and Emergency Services15 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
27NOC from Fire Department (Final N.O.C for Steam Engines and Boilers to construct or establish any factory workshop or workplace in which it is proposed to employ steam power , water power or other mechanical power or electrical power)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
28NOC from Fire Department (Final NOC for storage places of flammable and hazardous goods.)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
29NOC from Fire Department (Final NOC for Hotel under 3 & 4 starred Category as per National Building Code of India 2005, Part 4 (Fire and Life Safety)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
30NOC from Fire Department (Final NOC for Storing and/or selling of Fire Works more than 25 kgs. And up to 50 Kgs. under Explosive Act 1984 and Rules 1983)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
31NOC from Fire Department (Final NOC for Storing and/or selling of Fire Works upto 25 kgs. Under Explosive Act 1984 and Rules, 1983)Directorate of Fire and Emergency Services10 days
1.One set of blue print (approved by Planning & Development Authority) of the site plan, Elevations, Section and all floor plans signed by the owner and Architect/Engineer.

2.One set of Fire Protection Plans signed by the Owner and Architect/Consultant indicating the Fire Prevention and Fire Protection Provisions (Active & passive) that are proposed to be incorporated in the building

3.Declaration of the Architect and Owners of the building in the format provided by the Directorate (specimen attached as Annexure ‘A’)

4.An undertaking signed by the Owner/Applicant on a Rs.50/- Stamp Paper for abiding with the fire prevention and fire protection measures as required in the initial NO Objection Certificate or as amended from time to time (specimen attached as Annexure ‘B’)
Shri. Nitin Raiker

dir[hyphen]fire[dot]goa[at]nic[dot]in
32Registration of Manufacturer of Weights and MeasuresDepartment of Legal Metrology15 days
1.Copy of certificate of GST registration

2.Identity Proof(PAN card - Id proof,Identity documents,Voter Id card - Id proof,etc)

3.Trade proof

4.Label detail

5.List of names of the commodity/commodities to be pre-packed

6.Ownership Documents(Ownership documents of the premises,Sale Deed,Partnership Deed,etc.)

Shri. Vikas Kandolikar

Vikaskandolkar21[at]gmail[dot]com
33Registration of Manufacturers of Packaged CommoditiesDepartment of Legal Metrology15 days
1.Copy of certificate of GST registration

2.Identity Proof(PAN card - Id proof,Identity documents,Voter Id card - Id proof,etc)

3.Trade proof

4.Label detail

5.List of names of the commodity/commodities to be pre-packed

6.Ownership Documents(Ownership documents of the premises,Sale Deed,Partnership Deed,etc.)

Shri. Vikas Kandolikar

Vikaskandolkar21[at]gmail[dot]com
34Registration of Importers of Packaged CommoditiesDepartment of Legal Metrology15 days
1.Copy of certificate of GST registration

2.Identity Proof(PAN card - Id proof,Identity documents,Voter Id card - Id proof,etc)

3.Trade proof

4.Label detail

5.List of names of the commodity/commodities to be pre-packed

6.Ownership Documents(Ownership documents of the premises,Sale Deed,Partnership Deed,etc.)

Shri. Vikas Kandolikar

Vikaskandolkar21[at]gmail[dot]com
35Drug Licenses for setting up a Wholesale drugs sales in stateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
36Drug Licenses for setting up a Own Allopathic Manufacturing Unit in State Drug Licenses for setting up a Loan Allopathic Manufacturing Unit in StateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
37Licenses for setting up a Own Cosmetics Manufacturing unit in stateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
38Licenses for setting up a Loan Cosmetic Manufacturing unit in StateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
39Drug Licenses for setting up a Loan Ayurvedic Manufacturing Unit in StateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
40Drug License for setting up a Homeopathic Manufacturing Unit in StateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
41Drug Licenses for setting up unit to manufacture Large Volumes Parenteral/Vaccines/Sera in StateDirectorate of Food and Drugs Administration30 days-
Smt. Jyoti Sardesai

off[hyphen]dfda[dot]goa[at]nic[dot]in
42Consent to Operate
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1. Land Allotment/earmarking letter or lease/Sale deed/Form I & XIV.

2. Flow Chart and detailed production process.

3. A copy of Project Report for projects costing Five crores and above.

4. Site plan (not required for units to be set up in Industrial Estates.)

5. Layout plan showing the location of manufacturing equipments, water supply/drainage lines,position of chimneys, effluent treatment plant and final discharge Point, Sludge solid waste disposal points and septic tanks/soak pits.

6. For industries/activities listed in Schedule I of the Environmental Impact Assessment (EIA) Notification 2006 copy of the EIA report/Form/Report submitted for obtaining Environmental Clearance and other survey, if required will have to be furnished in the prescribed time limit.

7. Photocopy of the prior Environmental Clearance (EC) issued by the Competent Authority, if applicable, for project listed in the Environment Impact Assessment (EIA) Notification, 2006,as amended from time to time.

8. Site plan showing surrounding Residential area, public places, water stream, etc., of the factory site within a radius of 5kms with waste water treatment and disposal systems clearly indicating where waste ² water is proposed to be disposed off (for medium and large scale enterprises).

9. Schematic sketch of the proposed effluent/sewage treatment system/plant (ETP/STP) and/or septic tanks/soak pit, duly signed by authorized person, along with detailed design calculation.

10. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I). (refer sample specimen below). In case of leased/hired premises/plant/machinery/equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

11. Original authorization letter of the person to whom authorization is made to sign this application form except individual proprietary concern.

12. Any other documents/clarification as requisition by the Goa State Pollution Control Board.

Renewal of Consent to Operate

13. Certificate from Chartered Accountant certifying the Total Estimated Investment (T.E.I).(refer sample specimen below). In case of leased/hired premises/plant/machinery/equipment a certificate from a Registered Valuer towards capital cost is to be submitted without appreciation and depreciation.

14. Previous Consent to Operate issued by the Board

15. Stack Analysis Report/Analysis report of Treated effluent/sewage.

16. Any changes/modifications in the industry after the consent obtained.

17. Application for auto renewal of Orange and Green category will be accompanied by an affidavit annexed hereto for an individual proprietary concern.

18. Any other documents/clarification as requisition by the Goa State Pollution Control Board.
Shri. Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
43Authorisation under Bio-medical waste
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1. Air and Water Consent (for Hospitrals)

2. Copy of previous Annual Report if applicable

3. Any other
Shri. Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
44Authorization under Batteries Waste
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1.Any DocumentsShri. Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
45Registration under Plastic Manufacture and Usage Rules
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1. Valid water and air consent

2. Action Plan for collecting back the plastic waste endorsed by Secy I/C, UD.
Shri. Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
46Authorization under E-waste
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1. Copy of the Consent if Issued
2. Any Other
Shri. Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
47Registration of HotelsDirectorate of Tourism30 Days
1. Ownership Documents (In case premises is owned) - title deeds like Gift deeds Or Sale deeds or Form I & XIV or House Tax receipt or Lease and Licence agreement (if leased) or Notarized copy of NOC from the owner of the premises

2. Goods and Services Tax registration certificate (if applicable
)
3. Adhar Card of the Applicant or any other ID proof

Note : No documents are required for Renewal.
-

48Licensing of Beach ShacksDirectorate of Tourism10 Days-

-

49Manufacturing Insecticide/Pesticide LicenceDirectorate of Agriculture30 Days-

-

50Udyog Aadhar MemorandumDirectorate of Industries, Trade and CommerceSame Day-Smt. Geeta Joshi


dir[hyphen]indo[dot]goa[at]nic[dot]in
51Alignment Confirmation CertificateDirectorate of Municipal Administration7 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
52Occupancy CertificateDirectorate of Municipal Administration8 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
53NOC for Water ConnectionDirectorate of Municipal Administration14 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
54NOC for Power ConnectionDirectorate of Municipal Administration14 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
55NOC for Road CuttingDirectorate of Municipal Administration14 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
56NOC for Sewerage ConnectionDirectorate of Municipal Administration14 Days-Shri. Gurudas Pilarnekar

dir[hyphen]dma[dot]goa[at]nic[dot]in
57Licence for Manufacture of IMFL/ WineExcise DepartmentNo timeline prescribed-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
58
Licence for Manufacture of BeerExcise DepartmentNo timeline prescribed-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
59
Licence for Manufacture of Beer by Pub Brewery / Microbrewery in Bar & RestaurantExcise DepartmentNo timeline prescribed-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
60Licence for bottling of Country Liquor and Blending of Country LiquorExcise DepartmentNo timeline prescribed-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
61Licence for Wholesale of IMFL / FL / CLExcise Department37 Days-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
62
Licence for Retail Sale of IMFL, CL & FL in Packed BottlesExcise Department37 Days-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
63Licence for Retail Sale of IMFL, CL & FL for ConsumptionExcise Department37 Days-Smt. Shilpa Gawas

gawasshilpa[dot]goa[at]gov[dot]in
64Application for Occupancy Certificate in Industrial EstatesGoa Industrial Development Corporation8 Days-Shri. P. Pravimal Abhishek

goaidc1965[at]gmail[dot]com
65Application for NOC for power connection in industrial areaGoa Industrial Development Corporation8 Days-Shri. P. Pravimal Abhishek

goaidc1965[at]gmail[dot]com
66Application for Water connection in industrial area (i) for industrial units (1 and above) (ii) for industrial units (1/2 and 3/4)Goa Industrial Development Corporation(i) 14 Days
(ii) 6 Days
-Shri. P. Pravimal Abhishek

goaidc1965[at]gmail[dot]com
67Registration & Grant of Factory LicenseInspectorate of Factories & Boilers21 Days1.Paid e-challan / receipt in original towards payment of fees.

2.Documentary / objective evidence in respect of compliance to the condition(s), if any, laid during approval of factory plans.
Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
68Approval of Notice of Period of Work for Adult WorkersInspectorate of Factories & Boilers15 Days-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
69
Inspection for open / hydraulic test of boilerInspectorate of Factories & Boilers21 Days-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
70
Inspection for hydraulic test of steam pipelineInspectorate of Factories & Boilers21 Days-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
71Issue of provisional Order in Form VInspectorate of Factories & BoilersWithin 48 hours from inspection for open / hydraulic test-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
72
Recognition As A Competent Person (Third Party) Under Factories Act, 1948Inspectorate of Factories & Boilers60 Days-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
73Recognition As Boiler Repairer/Erector Under The Boilers Act, 1923 And Indian Boilers Regulation, 1950Inspectorate of Factories & Boilers30 Days-Shri. Premanand V. Gaude

pgaude[hyphen]ifb[dot]goa[at]nic[dot]in
74Application for Registration of Establishments Employing Contract labourOffice of the Commissioner, Labour & Employment15 Days
1.Form VI- Issued by Employer

2.Identity Proof (PAN card,Driving License,Aadhar card,Passport copy, etc;)

3. Partnership Deed(In case of Partnership firm)

4. Memorandum / Article of Association (In case of Pvt Ltd Co.)

5.List of Directors(In case of Pvt Ltd Company)

6. Authority Letter for signature on application (In case of Private Limited company)

7. Work Order (In case principal employer is Government establishment)
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
75Application for Registration of Establishments Employing Migrant Workmen.Office of the Commissioner, Labour & Employment15 Days
1.Identity Proof (PAN card,Driving License,Aadhar card,Passport copy, etc;)

2. Partnership Deed (In case of Partnership Firm)

3. Memorandum of Association / Article of Association

4. List of Directors (In case of Private Ltd Co.)

5.Authority Letter for signature on application(In case of Private Limited company)
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
76Application for Registration of Establishments Employing Building Workers.Office of the Commissioner, Labour & Employment15 Days
1.Identity Proof (Pan card, Driving License, Aadhar card,Passport copy)

2. Partnership Deed (In case of Partnership Firm)

3. Memorandum of Association / Article of Association (In case of private limited company)

4. List of Directors (In case of Private Ltd Co.)

5. Work Order (If Pricipal employer is Govt Establishment)

6. Agreement between Principal employer and Contractor (If Principal employer is Govt Est.)

7. Demand draft / Cheque
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
77Application for License for Contractors in order to employ Contract LabourOffice of the Commissioner, Labour & Employment15 Days-
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
78Application for License for Contractors in order to employ Migrant LabourOffice of the Commissioner, Labour & Employment15 Days-
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
79
Application for Issue of Registration Certificate for Shops or EstablishmentsOffice of the Commissioner, Labour & Employment7 Days
1. Trade Licence/NOC from Panchayat (not provisional.Provisional NOC will not be entertained)/ Self Declaration by employer on stamp paper

2. Premise Document (House Tax copy or Lease Agreement or Sale Deed or Gift Deed or NOC from land owner (On Rs. 50 Stamp paper, notarised)

3.Identity Proof (PAN card,Driving License,Aadhar card,Passport copy, etc;)

4. Partnership Deed(In case of Partnership firm) and Registration certificate from Registrar of Firms

5. Memorandum / Article of Association (In case of Private Limited company) and Registration Certificate from Registrar of Companies along with list of Board of Directors

6. Authority Letter for signature on application (In case of Private Limited company)

7. Food and Drug Licence copy (In case of hotel, restaurant eating joints etc.)

8. Excise Licence copy (In case of Bar and restaurant)

9. Licence from mining department / Licence from tourism department (In case of sand materials)

10. RBI authority letter (In case of money exchange)

11. Form XXV (Notice of Shops/Establishment)

12. Form XXIV (Notice of close day or a change in close day)

13. Form XXVIII (List of holidays)
Shri. Prasad Pednekar

com[hyphen]labo[dot]goa[at]nic[dot]in
80Grant of Occupancy CertificatePanchayat Directorate30 Days-
Smt. Siddhi Halarnakar

dir[hyphen]panc[dot]goa[at]nic[dot]in
81Issue of Completion Order by PDAPlanning & Development Authority (PDA)15 Days-
-
82
Issue of Completion Order by TCPDTown & Country Planning Department (TCP Dept.)15 Days-
Smt. Vertika Dagur


vertika[dot]dagur[at]gov[dot]in
83
Authorization under Hazardous Waste
Goa State Pollution Control Board
45 Days (Green Category)

60 Days (Orange Category)

90 Days (Red Category)
1. Environmental Clearance

2. Emergency Response Plan (ERP)

3. Consent Copy

4. Registration cum Passbook Certification

5. Transportation Vehicle Details

6. Any other
Shri Nandan Prabhudessai

nandan[dot]prabhudessai[dot]np[at]gmail[dot]com
84
NOC for road cutting in industrial estatesGoa Industrial Development CorporationNo prescribed time limit1.Location plan in A4 sizeShri. P. Pravimal Abhishek

goaidc1965[at]gmail[dot]com
Skip to content